Every FlowMCP schema travels a defined path from an initial idea to a production deployment, and this page is the canonical description of that path: the six lifecycle stages, the special rules for static and migrated schemas, and the policy for handling schemas where only some primitives pass. It is the recommended way to develop a schema, and where other lifecycle descriptions in the project (README files, runbooks, skill documentation) disagree, this page is authoritative.

A namespace candidate enters the picture even before the first stage. Before stage:research, a candidate lives as a Prospect on the Kanban board — identified as interesting but not yet confirmed as reachable or feasible. A Prospect sits upstream of the six stages and is not tracked within them; the act of verifying reachability and feasibility is what promotes it into stage:research.


StageLabelEntry ConditionExit Condition
1stage:researchAPI endpoint discoveredAPI reachable, schema creation is feasible
2stage:creationResearch completeSchema file created in tests/new-schemas/
3stage:api-testSchema createdflowmcp grading deterministic → min. 1 PASS (see Special Rule)
4stage:validationAPI test passedflowmcp schema-check → 0 errors
5stage:gradeValidation passednamespaceAggregate grade B or better
6stage:productionnamespaceAggregate grade B+ confirmedDeployed to providers/ in production catalog

Two tracks. The six stages above are the development lifecycle and live here. Monitoring, issue tracking, and the grade rollup live in the Grading-Spec, not on this page. These two are no longer the same single sequential gate — see Validate-before-grade ordering below.

stage:research — The API has been identified as a candidate. The developer verifies that the endpoint is reachable and that the schema design is feasible (authentication model, response format, parameter structure).

stage:creation — The schema file is written and placed in tests/new-schemas/{provider}/. This stage covers the authoring process — defining tools, parameters, shared list references, handlers, and test cases.

stage:api-test — The schema is tested against the live API using flowmcp grading deterministic <id>. At least one tool must return a PASS result. See the API-Test Special Rule below for schemas with no HTTP tools.

stage:validation — The schema passes structural validation: flowmcp schema-check <path> returns 0 errors. All validation rules from 09-validation-rules.md must be satisfied.

stage:grade — The schema receives a quality grade. The gate references the namespaceAggregate grade — the provider-level rollup — not an implied per-schema grade computed inside this lifecycle. A per-schema grade rolls up into the namespace aggregate, and the aggregate is what the gate checks: namespaceAggregate grade B or better is required for production deployment. The grade computation — including the rollup and the aggregate — is owned entirely by the Grading-Spec; the lifecycle only consumes the resulting namespaceAggregate and delegates the grading model to that standard.

stage:production — The schema is moved from tests/new-schemas/ to providers/{namespace}/ in the production catalog and registered in registry.json.

Validate-before-grade ordering (two tracks)

Section titled “Validate-before-grade ordering (two tracks)”

Up to 4.2 this lifecycle implied a single strict sequence: validation passes, then a grade is produced. From 4.3 that sequencing is relaxed for the monitoring/grading track:

  • A monitoring/grading record MAY exist in a blocked state for a schema that has NOT cleared stage:validation (emit-on-failure — the Grading-Spec import gate emits a blocked node with reason: validation-failed instead of aborting).
  • This blocked monitoring record does NOT advance the schema toward stage:production. The development gate is unchanged: validate-clean (flowmcp schema-check → 0 errors) is still required before stage:production.

In other words: the development gate (validate before production) stays; the monitoring record (emitted regardless of validation outcome) is the grading track’s concern. The two are no longer the same single sequential gate. The emit-on-failure contract and the pinned blocked reason set are defined by the Grading-Spec.


Not all schemas make HTTP calls. A schema is considered static when all of its primitives are non-HTTP:

Schema TypeHas HTTP?API-Test Required?
At least 1 Tool or HTTP-ResourceYesYes — min. 1 PASS required
Exclusively Prompts / static SkillsNoAuto-PASS — stage skipped

Static schemas — schemas that contain only Prompts and/or static Skills (no Tools, no HTTP-Resource) — receive an automatic PASS for stage:api-test. There is no live API to test against. The stage is considered complete and the schema proceeds directly to stage:validation.

Note: In practice, static schemas are rare. The primary use case is future Prompt-only schemas or documentation-only namespaces. Most schemas in the community catalog contain at least one Tool.

Migration schemas — schemas migrated from v3 that contain only static primitives also receive Auto-PASS. See Migration Special Rule.


A schema brought forward from an older FlowMCP version does not need to repeat the lifecycle from scratch. It enters at stage:api-test rather than stage:research, because the research and creation stages are already complete by virtue of the existing schema; every subsequent stage (stage:api-test through stage:production) then applies normally. The full migration procedure — what changes between versions and how to update each part of a schema — lives in the Migration Guide.


Two tracks. This policy is part of the development lifecycle (the six stages above). Monitoring, issue tracking, and the grade rollup live in the Grading-Spec. A removed primitive becomes a blocker on the one grading-issue per namespace, not a standalone issue.

All failing primitives MUST be removed before a schema is deployed to production. A schema with failing tools, resources, or skills cannot enter stage:production.

Rationale: An LLM working with a schema assumes that every registered primitive is functional. If getTokenPrice is listed but always errors, the agent has no way to know — it will attempt the call, fail, and potentially produce incorrect results. Removing failing primitives eliminates silent failures at the cost of reduced coverage.

// BEFORE — etherscan-io/contracts.mjs with 3 tools, 1 failing
tools: {
getContractAbi: { /* ... */ }, // PASS — keep
getSourceCode: { /* ... */ }, // PASS — keep
getCreationCode: { /* ... */ } // FAIL — remove before production
}
// AFTER — ready for production
tools: {
getContractAbi: { /* ... */ }, // PASS
getSourceCode: { /* ... */ } // PASS
}
// getCreationCode removed — tracked as a blocker on the namespace grading-issue

There is no percentage threshold. Each failing primitive is evaluated individually:

  • 1 of 8 tools failing → remove the 1 failing tool, deploy the 7 passing tools
  • 3 of 5 tools failing → remove 3 failing tools, deploy 2 passing tools
  • All tools failing → schema does not deploy (no primitives remain)

The threshold-free policy prevents edge cases where a “60% pass rate” is considered acceptable. Either a primitive works or it does not.

Removed primitives are not abandoned — they are tracked for future resolution:

  1. Blocker on the namespace grading-issue — A removed primitive becomes a blocked node / blockers[] entry under the one grading-issue per namespace (defined by the Grading-Spec monitoring track). No separate per-primitive issue is opened, and there is no parent-schema-issue link — the two tracks are not coupled.
  2. Backlog stage — The removed primitive starts at stage:research (with the API reachability already known).
  3. Resolution path — When the underlying issue is fixed (changed API, missing auth, updated handler), the primitive is re-added to the schema and goes through stage:api-teststage:validationstage:grade.
  4. Re-integration — The fixed primitive is merged back into the production schema. A new grade check may be required if the primitive significantly changes the schema’s scope.

A primitive fails the API test when:

  • The HTTP response is a non-2xx status code (authentication error, rate limit, deprecated endpoint)
  • The response does not match the declared output.schema
  • The handler throws an uncaught exception
  • The tool times out consistently (> 30 seconds)

A primitive passes when at least one of its test cases returns a 2xx response with a parseable body that matches the declared output shape.